Quality inspection bench at Xinwinf CNC machining factory
Quality Control

Quality Control & Inspection

Quality at Xinwinf is a sequence of checks, not a final promise: engineering DFM review, first article inspection, in-process inspection, final inspection and packing — with every part matching your drawing.

Inspection Process

Five Checks Between Drawing and Shipment

Each gate exists to catch problems early — before material is cut, before a batch runs, and before boxes close.

Engineering DFM Review

Our engineers review every drawing before quoting — tolerances, features, material and finish — and flag anything risky or hard to hold, with suggested fixes. Free DFM analysis comes with every quote.

First Article Inspection (FAI)

The first part is measured feature by feature against your drawing and documented. An FAI report with measured data and part photos is available before any batch run — the approved first article becomes the reference for the order.

In-Process Inspection

Key dimensions are re-checked at intervals during the run, so tool wear or drift is caught and corrected instead of turning into a whole bad batch.

Final Inspection

Dimensional re-check against the drawing, plus 100% visual inspection for burrs, scratches and finish defects. Plated and coated parts get salt-spray testing when the order requires it.

Packing

Quantity, packaging and labeling are checked before box closure — individual bagging and foam separation protect finished surfaces in transit.

Inspection Equipment

What We Measure With

The equipment below is used on orders in our Shenzhen facility.

CMM coordinate measuring machine verifying a machined part

Coordinate Measuring Machine (CMM)
3D verification of critical dimensions, positions and profiles against your drawing — results documented in the FAI and final inspection reports.

2.5D vision measuring instrument (TESA) checking a machined part

2.5D Vision Measuring Instrument
Optical measurement of small features, profiles and hole positions that calipers cannot reach.

Salt-spray corrosion testing chamber

Salt-Spray Tester
Corrosion-resistance validation for plated, anodized and coated finishes.

Inspectors checking anodized parts at the visual inspection line

100% Visual Inspection
Every part checked for burrs, scratches and finish defects before packing.

Finished machined parts prepared for final packing
Tolerances & Documents

Tolerances Per Drawing, Records On Request

Parts are inspected to your drawing. Achievable tolerances depend on the feature, material, size and process — send the drawing and our engineering review confirms what we can hold per critical feature, in writing, before you order.

FAI report available. On production orders, first-article measured data and part photos are documented before the batch runs, so you can approve or request adjustments up front.

  • Dimensions checked against drawing values at FAI, in-process and final inspection
  • Surface Finishing (anodizing, plating, powder coating, passivation, black oxide) is managed through qualified partners and inspected on our bench before packing
  • 100% of parts visually inspected; salt-spray testing applied when plated/coated finishes require it
  • If your project needs specific documentation, tell us the requirements with your RFQ and we’ll confirm what we can provide
See the Full Order Process →
Certifications

ISO 9001:2015 Certified Quality System

Independently audited by an IAF-accredited certification body — the same system that runs every check on this page.

ISO 9001:2015 quality management system certificate of Shenzhen Xinwinf Hardware

Issued to Shenzhen Xingweifeng Hardware Products Co., Ltd — the registered legal entity of the Xinwinf brand. Download full certificate (PDF)

  • Standard: GB/T 19001-2016 idt ISO 9001:2015 quality management system
  • Scope: production and sales of hardware accessories — CNC machined parts
  • Certificate No. 98525Q00009R053 · valid until 2028-11-12, under annual surveillance audit
  • Accreditation: certification body accredited by IAF and IAS (MSCB-383); verifiable on the CNCA official website
  • Need it for your supplier file? Ask with your RFQ and we’ll send the PDF
View Certificate (PDF) →

Got a Part With Tight or Specific Requirements?

Send the drawing and mark the critical dimensions. We’ll confirm achievable tolerances and tell you exactly how the part would be inspected — quote in about 1 working day, with free DFM analysis.

Ask About Inspection →